On Wednesday afternoon, at the request of power engineers, we set off to wash the road in the length of about 200 meters between the villages of Vysoké Mýto – Brteč and Vysoké Mýto – Svařeň from mud deposits from the field. The road was polluted by working machines that performed HV repairs in the adjacent field. Subsequently, the unit moved to the village of Hrušová, where for the same reason, the road was washed in the length of 100 meters. She then returned to base.